MANUFACTURING
Production Control System
Manage production schedules and record output.
Who uses it Production planners, line supervisors and plant managers
Why your business needs it
What goes wrong
Planners struggle to compare the production schedule with actual output. Without a consistent way to compare the plan with actual output, a short batch can go unnoticed until a shipment or downstream job is due.
When to add it
You run repeat batches or production schedules and need to decide what to reschedule when actual output falls short.
What to measure
How soon after a run can planning explain the difference between planned and actual output?
Example business · Packaging manufacturer
A business walkthrough
A batch was planned for 500 cartons, but the line recorded 460. The planner needs to identify the 40-unit gap before promising the next shipment.
-
Plan batch
Review the planned batch quantity and schedule
-
Record output
Check the output recorded for the run
-
Compare results
Compare the two and decide whether to adjust the next production plan
Production stages
This diagram could not load. The key and walkthrough describe the same process.
- Floors
- Stages in the production schedule
- Car
- Where recorded output has reached
The floors represent stages in a production schedule. Compare the planned stage with the output already recorded.